Oomiak staff contributed generously to this project by volunteering their time and expertise
Learn moreOomiak’s team modified the container to provide reinforced openings for air intakes, air discharges, demineralised water connections, electrical connections and water make up connections.
Learn moreOomiak were engaged by Swire's to concept, design, manufacture, install and commission these refrigeration upgrades.
Learn moreOomiak was contracted by Clarke Energy for the design and fabrication of a skid mounted gas and pre-chamber gas conditioning unit.
Learn moreThe existing refrigeration plant serving the facility needed to remain in operation throughout the installation.
Learn morePlanning was the key to the successful completion of this project, which involved decommissioning of three sites and consolidating at Regency Park.
Learn moreOomiak was engaged to fabricate and install chilled water piping for the Cloudbreak Mine for the Pilbara Infrastructure Project in Western Australia
Learn moreReplacement of the filling room Air Handling Unit and installation of associated ductwork
Learn moreSupply and install of equipment necessary for the refurbishment of an air conditioning and ventilation system
Learn moreOomiak provided all mechanical services, cooling, heating and air distribution systems for Baiada Poultry’s new chicken hatchery in Tamworth
Learn moreMore than 230, 6m lengths of pre-insulted pipe were supplied from Australia with pipe ranging in size from 25NB up to 300NB
Learn more