• Filter by

Calendar Cheese Cold Store Refrigeration

Oomiak provided a new refrigeration system to serve Calendar Cheese's new warehouse in Truganina.

Learn more

Pinata Farms – Tasmanian Berry Fast Cooling Project

Oomiak were engaged by Pinata Farms to design, supply, install and commission a refrigeration system to serve two Fast Cool rooms for a berry facility in Tasmania.

Learn more

R22 System Replacement – Arnott’s Biscuits

A key challenge for this significant project was to successfully deliver a complex solution within a fully operational critical manufacturing facility for iconic biscuit manufacturer Arnott’s.

Learn more

Statewide Independent Wholesalers (SIW) Regional Distribution Centre expansion

The 13,0000m² facility includes 4,600m² of freezer at -24 degrees and 7,700 m² of chiller and staging area

Learn more

JAT Mackay Distribution Centre

JAT Refrigerated Transport were seeking a refrigeration plant to service their new refrigerated distribution center in Mackay, QLD.

Learn more

Truganina Chilled Water System

Oomiak’s skills of working with clients without impacting on their operational needs were critical.

Learn more

Oomiak Fast Cooler – Table Grapes

Vertex Refrigeration were undertaking a project requiring the fast cooling of table grapes

Learn more

National Flower Centre Coolroom

Oomiak was engaged to design and install a purpose built coolroom to meet specific conditions required to maintain the quality of fresh flowers.

Learn more

LaManna Fresh Produce Ripening Rooms

Oomiak was engaged to design, install and commission 12 new ripening rooms at the Brisbane Markets facility.

Learn more

High-Humidity Fast Cooler – Grapes

Oomiak were engaged to design and build a high capacity forced air cooling system for the rapid removal of field heat from grapes.

Learn more

Emergent Cold – Install Thermofin Condenser

The job included major pump downs that were thoroughly planned and well executed with a safety focus.

Learn more

Hilton Meats – Bunbury Skin Pack

Oomiak was engaged to assess the heat rejection requirements of the additional equipment and determine system requirements to match demand

Learn more