Project Overview
Yering Station required a heating shed to sterilise tractors, harvesting machinery and other equipment that comes into contact with vines and soil that is then intended to be moved off site to other regional vineyards and wineries.
The process involved heating equipment required to be sterilised to 45°C and holding it at this temperature for 12 to 24 hours.
Oomiak designed, supplied and installed heating, temperature control and monitoring equipment to serve the new machinery heating shed at their facility.