Project Overview
Working at a leading poultry producer’s WA facility in Osborne Park, the Oomiak team was brought on-site to complete an industrial refrigeration plant upgrade.
Looking to increase their refrigeration load, this company wanted a solution that would meet both immediate and future demands. To accomplish this a series of equipment was installed to boost the WA plant’s capacity, including:
- A new accumulator to serve the new water spiral chiller system they had installed
- A new compressor package to replace the existing one
- Replacing an existing condenser with a new evaporative one
- Significant re-piping of the main header lines removing two redundant vessels and pipework headers and connection to the new accumulator
- Upgrading of safety equipment in relation to existing compressors to ensure compliance to current refrigeration standards
Additionally, Oomiak facilitated:
- The removal of existing equipment
- The installation of the new equipment including a new high-temperature screw compressor package and evaporative condenser
- Pipework connections
- Safety works to ensure site compliance
Oomiak’s well thought out planning and execution of the after-hours shut downs and change over periods was key to ensuring no disruptions to day-to-day business.